What is positive train control?

US operations of Class I railroads have implemented PTC in all places where it’s required

This Ask Waves article explains positive train control. (Photo: Jim Allen/FreightWaves)

In a nutshell, what is positive train control

Positive train control (PTC) is a way to automatically stop a freight or passenger train before a collision. PTC was designed as the last line of defense to prevent collisions or derailments caused by human error such as excessive speed, misaligned track switches or unauthorized entry into work zones.

PTC systems are on Class I railroads’ main lines, over which 5 million or more gross tons of annual traffic and certain hazardous materials are transported, according to the Federal Railroad Administration (FRA). They are also on any main lines over which intercity or commuter rail passenger transportation is regularly provided. 

PTC systems are interoperable, meaning the locomotives of any host and tenant railroads operating on the same PTC-equipped main line communicate with and respond to the PTC system, including during uninterrupted movements over property boundaries.

“PTC is a risk reduction system that Congress mandated 41 railroads implement to save lives, protect property and make America’s vast rail network considerably safer,” FRA told FreightWaves. “PTC systems prevent train-to-train collisions, over-speed derailments, incursions into established work zones, and movements of trains through switches left in the wrong position. They also provide a solid foundation upon which future safety improvements can be realized.”

How does it work?

The speed and location of trains are tracked through a combination of GPS systems, computers installed on board the locomotives and radio equipment installed along the railway wayside. PTC systems overlay existing railroad hardware and software. When a train is running at a speed or in an area where it shouldn’t be, a warning signal is first sent to the engineer. If the engineer does not respond, the train brakes automatically. 

What gave rise to PTC? 

On Sept. 12, 2008, a collision in Chatsworth, California, killed 25 people and injured 135 others. The collision took place when an engineer of a Metrolink passenger rail system was texting. That distraction led to a collision with a Union Pacific freight train. The following month, Congress passed the Rail Safety Improvement Act (RSIA) of 2008 and President George W. Bush signed it into law. The RSIA mandated PTC for the majority of locomotives and track in the United States; the exception was the minority of track and locomotives that do not come in contact with passengers or hazardous materials. 

The initial deadline for implementing PTC was Dec. 31, 2015. The deadline was extended by three years to Dec. 31, 2018, which also included an extension of an additional two years to year-end 2020 with the approval of the Department of Transportation, provided certain parameters were met by year-end 2018.

As of Dec. 31, 2020, all the railroads required to implement PTC systems had done so, including all the U.S. operations of the Class I railroads, according to FRA.

How have the railroads described PTC since it became mandated? 

In the years immediately following the RSIA, the management teams of the Class I rails largely bemoaned PTC as an “unfunded mandate” since the railways were expected to finance multibillion-dollar PTC capital expenditures themselves without a credit from the federal government. The railways also expressed concern that PTC would reduce railway capacity because it would make railway operations overly conservative, requiring excessive space between trains, or provide “false positives” and stop trains unnecessarily.

But in recent years, the Class I railways changed their tone on PTC. Instead, they have highlighted the potential improvements to efficiency that PTC may give rise to with the railways’ newfound PTC-related data. 

PTC “has created an additional layer of safety to the rail network that can safely bring a train to a stop before certain types of human-error accidents can occur. The charge of being able to bring a train to a safe stop may sound simple, but the technology and the effort necessary to bring PTC to life was not,” the Association of American Railroads (AAR) told FreightWaves.

AAR continued, “To meet that charge, railroads had to be able to first precisely track a train’s location, speed and direction across the network. This required installing hundreds of thousands of components, building a secure communications network among many other tasks. Beyond that, the automatic braking technology had to work seamlessly across other railroads’ operations requiring rigorous testing and industry-wide cooperation.”

What’s next after PTC? 

The freight rail industry is looking at whether trains could run closer together as a way to increase capacity. The industry is also examining how PTC-related data could instruct the railways on how to more efficiently balance their networks.

“With the technology fully deployed, railroads now have detailed geo-mapping, advanced communications systems and modernized locomotive systems that can be used as a springboard for future innovation. Future rail innovation will undoubtedly have its roots in PTC,” AAR said.

FreightWaves reporter Joanna Marsh contributed to this report.

Upcoming FreightWaves Events
Compliance

Brokerage Compliance Symposium

The day before F3. Every compliance issue you face - fraud exposure, carrier liability, FMCSA rules, cargo theft, insurance gaps - navigated by attorneys and operators defining best practices in a changing industry.

October 26, 2026
The Signal at Chattanooga Choo Choo • Chattanooga, TN
Register Now
Awards

F3 Awards Dinner

The night before F3. FreightTech100 companies honored. FreightTech 25 and Shipper of Choice winners revealed live. Cocktail reception into dinner and live music - 300 industry leaders in one purpose-built room.

October 26, 2026
The Signal at Chattanooga Choo Choo • Chattanooga, TN
Register Now
FreightTech

F3: Future of Freight Festival

Industry-defining keynotes, rapid-fire technology demos, and industry leaders networking in experiences across Chattanooga - plus the inaugural F3 Awards Dinner featuring the FreightTech and Shipper of Choice reveals.

October 27, 2026 – October 28, 2026
The Signal at Chattanooga Choo Choo • Chattanooga, TN
Register Now
Compliance Brokerage Compliance Symposium Oct 26 • The Signal at Chattanooga Choo Choo • Chattanooga, TN

The day before F3. Every compliance issue you face - fraud exposure, carrier liability, FMCSA rules, cargo theft, insurance gaps - navigated by attorneys and operators defining best practices in a changing industry.

The Signal at Chattanooga Choo Choo • Chattanooga, TN Register Now
Awards F3 Awards Dinner Oct 26 • The Signal at Chattanooga Choo Choo • Chattanooga, TN

The night before F3. FreightTech100 companies honored. FreightTech 25 and Shipper of Choice winners revealed live. Cocktail reception into dinner and live music - 300 industry leaders in one purpose-built room.

The Signal at Chattanooga Choo Choo • Chattanooga, TN Register Now
FreightTech F3: Future of Freight Festival Oct 27 – Oct 28 • The Signal at Chattanooga Choo Choo • Chattanooga, TN

Industry-defining keynotes, rapid-fire technology demos, and industry leaders networking in experiences across Chattanooga - plus the inaugural F3 Awards Dinner featuring the FreightTech and Shipper of Choice reveals.

The Signal at Chattanooga Choo Choo • Chattanooga, TN Register Now

Michael Baudendistel

Mike Baudendistel is the Head of Intermodal Solutions at FreightWaves and author of The Stockout, focusing on the rail intermodal, CPG and retail industries. Prior to joining FreightWaves, Baudendistel served as a senior sell-side equity research analyst covering the publicly traded railroads, and companies that manufacture and lease railroad equipment, trucks, trailers, engines and components. His experience following the freight transportation industry also touched the truckload, Jones Act barge and domestic logistics industries. He is a CFA Charterholder.